What matters today
Computed on every load from the same functions the screens use. Nothing here is a saved snapshot. 10 orders that had to be placed, and were not
The oldest is ST-IB350-200UB, infrabuild 350 i-beam 200ub22, mill run, which had to be ordered on 30 Jun 2026 — 70 days ago. Every one of these is the needed-by date minus the lead time, so none of them is a judgement call.
See the action list 20 machines short of one part
HY-VB-WV-AB, walvoil activeblock proportional module, 98 day lead from Walvoil S.p.A.. First needed 19 Oct 2026. Cover lands 3 Nov 2026, 15 days after it is wanted.
Open the item 72 orders promising a date the factory cannot make
The nearest is SO-26-1195 for Webbline Agriculture Ltd, promised 31 Aug 2026 against a calculated 30 Oct 2026. Nobody has told the dealer, because until now nobody could see it.
See the order book 30 machines with nothing on order to fix them $907k of order value, short of 8 items that nobody has raised a purchase order for. Until one is raised the earliest these can start is the lead time from today. 6 machines past their date and still on the floor The oldest is BO-26-4107, Series 3 / PB650 / Hinge Adapter + RSE Turner for NC Equipment Ltd, booked onto the bench 27 Aug 2026 and still at stage 6. $67k receivable over ninety days Out of $2.05m owed. Read from HARMONiQ, which remains the system of record for it. 129% Fabrication in the week of 21 Sep 2 of the next thirteen weeks have a bench over capacity. That week carries 13 machines against a standard mix capacity of 14. Something moves, or something is late.
Ninety day load against capacity
Platform
1 of thirteen weeks have a bench over capacity When the shortages bite
Platform
Items short, and the machines each week holds up Where the money on the floor is
HARMONiQ
$400k across 65 machines Dig further
13 reports. Parameters on every one, print to PDF, download as CSV.Production
Build schedule 157 rows
What are we building, when, and will it make its date?
30 blocked or late
HorizonBrandStatusBench
At risk and blocked 55 rows
Which machines will miss their date, and why?
55 machines not on their date
HorizonBrandAccount
Shortage and action list 18 rows
What has to be ordered or made right now so that nothing stops?
18 items short
ShowSupplier
Forward requirements 18 rows
What does the plan consume, week by week, and when does stock run out?
18 run out inside the horizon
HorizonShow
Bench load 13 rows
Which bench gives out first, and in which week?
2 weeks with a bench over capacity
Horizon
Finance
Commercial
Order book 79 rows
What have we promised, and can the factory do it?
65 promises the factory cannot make
HorizonBrandAccountShow
Delivery performance 6 rows
How many machines went out on time?
$5.94m value
PeriodBrand
Dealer activity 55 rows
Who is buying, what are they waiting on, and what do they owe?
28 with a machine at risk
ChannelBrand
Machine register and warranty 514 rows
What have we built, for whom, and what is still under warranty?
514 in warranty
BrandAccountShowDespatched in