Components in the plan
18
Run out inside the horizon
18
Weeks shown
13
A reorder point is set for one item in isolation and knows nothing about the build plan. This is the other way round.
Forward requirements
Platform
18 rows · run 7 Sep 19:40 | Component | Lead | On hand | 7 Sep | 14 Sep | 21 Sep | 28 Sep | 5 Oct | 12 Oct | 19 Oct | 26 Oct | 2 Nov | 9 Nov | 16 Nov | 23 Nov | 30 Nov |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ST-IB350-200UB Infrabuild 350 I-beam 200UB22, mill run InfraBuild Steel | 70d | 0 | −55 | −40.8 +420 | −20.4 | −25.4 | · | −10 | −25.4 | −10 | −15 | −5 | −10 +300 | −15 | −10.4 |
| -55 | 324.2 | 303.8 | 278.4 | 278.4 | 268.4 | 243 | 233 | 218 | 213 | 503 | 488 | 477.6 | |||
| HY-MOT-DRILL-250 Rock drill motor 250cc Hydraflow Industries Ltd | 42d | 1 | −1 | · | −1 | · | −1 +3 | · | · | −1 | · | · | · | · | · |
| 0 | 0 | -1 | -1 | 1 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | |||
| HY-RAM-TELE-90 Telescopic lift ram 90 x 1500 Hydraflow Industries Ltd | 56d | 3 | −1 | · | −2 | −1 | −1 | −1 | −1 +5 | · | · | · | −1 | · | · |
| 2 | 2 | 0 | -1 | -2 | -3 | 1 | 1 | 1 | 1 | 0 | 0 | 0 | |||
| ST-IB350-310UB Infrabuild 350 I-beam 310UB40, mill run InfraBuild Steel | 77d | 37 | −14.8 | · | −14.8 | −7.4 | −7.4 | · | · | · | · | −7.4 | · +160 | · | · |
| 22.2 | 22.2 | 7.4 | 0 | -7.4 | -7.4 | -7.4 | -7.4 | -7.4 | -14.8 | 145.2 | 145.2 | 145.2 | |||
| BR-SLEW-800 Slew ring 800mm, internal gear Saeco Bearings NZ Ltd | 45d | 5 | −3 | −1 | −1 | · | −1 | −2 +8 | −2 | · | −1 | · | · | −1 | −2 |
| 2 | 1 | 0 | 0 | -1 | 5 | 3 | 3 | 2 | 2 | 2 | 1 | -1 | |||
| HY-RAM-ROT-63 Rotate ram 63 x 500, twin Hydraflow Industries Ltd | 42d | 16 | −5 | −2 | −3 | −1 | −2 | −4 | −3 +14 | · | −1 | · | −1 | −4 | −3 |
| 11 | 9 | 6 | 5 | 3 | -1 | 10 | 10 | 9 | 9 | 8 | 4 | 1 | |||
| HY-VB-WV-AB Walvoil ActiveBlock proportional module Walvoil S.p.A. | 98d | 15 | −3 | −1 | −2 | −6 | −1 | −2 | −5 | −2 | −3 +5 | −1 | −3 | −2 | −2 |
| 12 | 11 | 9 | 3 | 2 | 0 | -5 | -7 | -5 | -6 | -9 | -11 | -13 | |||
| HY-JOY-PROP Proportional joystick, ActiveBlock Walvoil S.p.A. | 91d | 25 | −3 | −1 | −2 | −10 | −1 | −2 | −7 | −2 | −5 +12 | −1 | −3 | −4 | −4 |
| 22 | 21 | 19 | 9 | 8 | 6 | -1 | -3 | 4 | 3 | 0 | -4 | -8 | |||
| HY-VB-WV-SD11 Walvoil SD11 8-bank valve, hydraulic pilot Walvoil S.p.A. | 105d | 3 | · | · | · | −2 | · | · | −1 | · | −1 | · | · | −1 | −1 |
| 3 | 3 | 3 | 1 | 1 | 1 | 0 | 0 | -1 | -1 | -1 | -2 | -3 | |||
| AI-FAN-HYD Hydraulic fan unit for air seeder Hydraflow Industries Ltd | 42d | 3 | · | · | −1 +4 | −1 | −1 | −1 | −2 | · | −2 | · | · | −2 | · |
| 3 | 3 | 6 | 5 | 4 | 3 | 1 | 1 | -1 | -1 | -1 | -3 | -3 | |||
| HY-RAM-SIDE-75 Side shift ram 75 x 900 Hydraflow Industries Ltd | 42d | 25 | −7 | −2 | −7 | −6 +20 | −5 | −6 | −4 | −5 | −2 | −4 | −2 | −1 | −4 |
| 18 | 16 | 9 | 23 | 18 | 12 | 8 | 3 | 1 | -3 | -5 | -6 | -10 | |||
| HY-HOSE-12-3600 Hose 2SN 12 dash, 3600mm, crimped both ends Hydraflow Industries Ltd | 14d | 100 | −12 | −4 | −20 | −8 | −12 | −14 | −16 | −6 | −6 | −4 | −8 | −8 | −6 |
| 88 | 84 | 64 | 56 | 44 | 30 | 14 | 8 | 2 | -2 | -10 | -18 | -24 | |||
| PL-SLIDE-UHMW-L UHMW mast slide, large, adjustable Manawatū Rubber & Seal Ltd | 11d | 88 | −32 | −24 +82 | −12 | −20 | −28 | −16 | −16 | −4 | −16 | −16 | −12 | −8 | −4 |
| 56 | 114 | 102 | 82 | 54 | 38 | 22 | 18 | 2 | -14 | -26 | -34 | -38 | |||
| PL-INSERT-ADJ-32 Adjustable insert 32mm, threaded Manawatū Rubber & Seal Ltd | 11d | 232 | −64 | −48 +116 | −24 | −40 | −56 | −32 | −32 | −8 | −32 | −32 | −24 | −16 | −8 |
| 168 | 236 | 212 | 172 | 116 | 84 | 52 | 44 | 12 | -20 | -44 | -60 | -68 | |||
| PT-2K-FPRED Two pack enamel, FencePro red Resene Industrial Coatings | 12d | 96.1 | −9.6 | −22.4 +79.1 | −32 | −12.8 | −19.2 | −22.4 | −9.6 | −19.2 | −6.4 | −19.2 | −6.4 | −12.8 | −6.4 |
| 86.5 | 143.2 | 111.2 | 98.4 | 79.2 | 56.8 | 47.2 | 28 | 21.6 | 2.4 | -4 | -16.8 | -23.2 | |||
| HY-VB-WV-SD5-4 Walvoil SD5 4-bank valve, cable control Walvoil S.p.A. | 98d | 45 | −6 | −4 | −7 | −5 | −5 | −2 | −1 | −4 | −4 | −3 | −3 | −2 | −2 |
| 39 | 35 | 28 | 23 | 18 | 16 | 15 | 11 | 7 | 4 | 1 | -1 | -3 | |||
| EL-LOOM-PROP Wiring loom, proportional control Hydraflow Industries Ltd | 28d | 19 | −3 | −1 | −3 +19 | −9 | −1 | −3 | −6 | −3 | −4 | −1 | −4 | −3 | −4 |
| 16 | 15 | 31 | 22 | 21 | 18 | 12 | 9 | 5 | 4 | 0 | -3 | -7 | |||
| MX-ROLLER-REAR Rear roller assembly Feilding Precision Engineering Ltd | 18d | 7 | · | −2 | −1 | −1 +4 | · | −2 | · | −1 | · | −2 | −1 | −2 | · |
| 7 | 5 | 4 | 7 | 7 | 5 | 5 | 4 | 4 | 2 | 1 | -1 | -1 |
Net requirement exploded from every scheduled build order through its bills of material, with projected stock underneath. Built by the Farmgear Operations Platform from live data on 8 Sep 2026. Stock, orders and costing are read from HARMONiQ; deals and campaigns from HubSpot; dates and readiness are calculated by the Platform.