BO-26-4116

Kinghitter Contractor / PB650 for Delmade Pty Ltd
NB Nathan General Manager
Kinghitter Contractor / PB650 Complete
Sales orderSO-26-1181 line 2
SerialKH26-4834
MastKHCONTR
BasePB650
AttachmentsNone
Released7 Aug 2026
Final assembly1 Sep 2026
Promised to dealer1 Sep 2026
Convergence date
31 Aug 2026

Every sub-assembly is ready on or before 1 Sep 2026, the day final assembly is scheduled to start. This machine can be built on its date.

Critical path
Kinghitter Contractor mast weldment
Complete 31 Aug
Onto the assembly bench 1 Sep 2026
Calculated completion 9 Sep 2026
Promised to dealer 1 Sep 2026

Production stages

Currently at stage 10 of 10 since 7 Sep 2026
  1. Released to production
    7 Aug
  2. Steel cut and prep
    10 Aug
  3. Fabrication and weld
    11 Aug
  4. Machining
    21 Aug
  5. Blast and paint
    25 Aug
  6. Hydraulic assembly
    28 Aug
  7. Final assembly
    1 Sep
  8. Test rig
    3 Sep
  9. QC sign-off
    4 Sep
  10. Ready for despatch
    7 Sep

Sub-assemblies

Platform
7 of 7 complete and in stores
Sub-assembly State Where Hours Required by Ready Verdict
Kinghitter Contractor mast weldment
Mast weldment · 10 day build · SA-MW-KHCONTR
In stores Stores 26 / 26 31 Aug 31 Aug Complete 31 Aug
PB650 base weldment
Base weldment · 5 day build · SA-BW-PB650
In stores Stores 16.1 / 16.1 31 Aug 26 Aug Complete 26 Aug
Hydraulic pack, ActiveBlock
Hydraulic pack · 2 day build · SA-HP-AB
In stores Stores 3 / 3 31 Aug 27 Aug Complete 27 Aug
Valve bank assembly, Walvoil ActiveBlock
Valve bank · 1 day build · SA-VB-AB
In stores Stores 2 / 2 31 Aug 26 Aug Complete 26 Aug
Ram set, large mast
Ram set · 1 day build · SA-RS-L
In stores Stores 1.5 / 1.5 31 Aug 27 Aug Complete 27 Aug
Hose kit, large mast
Hose kit · 1 day build · SA-HK-L
In stores Stores 2 / 2 31 Aug 31 Aug Complete 31 Aug
Decal and document set, KH
Decal set · 1 day build · SA-DS-KH
In stores Stores 0.5 / 0.5 31 Aug 28 Aug Complete 28 Aug

Value in this job

Standard cost
Material issued to date
$14,852
Labour booked to date
$3,363
Work in progress
$18,214
Material at standard, complete
$14,852
Labour at standard, complete
$3,363
Hours booked
73.1 / 73.1
Sold for
A$31,710

HARMONiQ costing and stock valuation come from HARMONiQ.

Activity and correspondence

Component requirements

StockNetting
0 lines still to issue against this machine
Component For Required On hand Allocated ahead Available On order ETA Shortfall