Production Calendar

3 Dec 2026 · 0 machines in view · capacity 14 a week
NB Nathan General Manager
← Today → 3 Dec 2026
Clear
On track At risk Blocked or late Complete Platform

Thu 3 Dec 2026

0 machines onto the bench
Nothing is booked onto the assembly bench on 3 Dec 2026. The benches are still loaded — the capacity band below shows the sub-assembly work running that day.

Capacity

Platform
Bench hours loaded against hours available. Anything over 100% cannot be done that day. Days already past are dimmed; the band looks forward.
Station Available T 3 Dec
Cutting
2 on the tools · Rangi Whaanga
16 h 0%
Fabrication
8 on the tools · Dave Kemsley
64 h 36%
Machining
2 on the tools · Ivan Petrovic
16 h 86%
Paint
3 on the tools · Manu Tipene
24 h 63%
Hydraulics
4 on the tools · Shaun Corry
32 h 41%
Final Assembly
5 on the tools · Tui Fraser
40 h 65%
Test Rig
1 on the tools · Barry Mellsop
8 h 56%
QC
1 on the tools · Yvonne Tapsell
8 h 31%