BO-26-4124

Maxam Flail Mower 2100 Offset for AGTEC Machinery Ltd
NB Nathan General Manager
Maxam Flail Mower 2100 / Offset On track
Sales orderSO-26-1211 line 2
Serialassigned at QC sign-off
AttachmentsNone
Released17 Aug 2026
Final assembly9 Sep 2026
Promised to dealer9 Sep 2026
Convergence date
8 Sep 2026

Every sub-assembly is ready on or before 9 Sep 2026, the day final assembly is scheduled to start. This machine can be built on its date.

Critical path
Maxam 2100 drive pack
Complete 8 Sep
Onto the assembly bench 9 Sep 2026
Calculated completion 15 Sep 2026
Promised to dealer 9 Sep 2026

Production stages

Currently at stage 6 of 10 since 4 Sep 2026
  1. Released to production
    17 Aug
  2. Steel cut and prep
    18 Aug
  3. Fabrication and weld
    19 Aug
  4. Machining
    28 Aug
  5. Blast and paint
    2 Sep
  6. Hydraulic assembly
    4 Sep
  7. Final assembly
    9 Sep
  8. Test rig
    11 Sep
  9. QC sign-off
    14 Sep
  10. Ready for despatch
    15 Sep

Sub-assemblies

Platform
3 of 4 complete and in stores
Sub-assembly State Where Hours Required by Ready Verdict
Maxam 2100 deck weldment
Deck weldment · 4 day build · SA-DW-MX2100
In stores Stores 16.5 / 16.5 8 Sep 4 Sep Complete 4 Sep
Maxam 2100 drive pack
Drive pack · 2 day build · SA-DP-MX2100
In stores Stores 3 / 3 8 Sep 8 Sep Complete 8 Sep
Maxam 2100 rotor assembly
Rotor assembly · 2 day build · SA-RA-MX2100
In stores Stores 4.5 / 4.5 8 Sep 7 Sep Complete 7 Sep
Decal and document set, MX
Decal set · 1 day build · SA-DS-MX
On the bench ASSY · Nikau Peters 0.2 / 0.5 8 Sep 8 Sep Fits, with 0 days to spare

Value in this job

Standard cost
Material issued to date
$6,808
Labour booked to date
$1,251
Work in progress
$8,059
Material at standard, complete
$6,971
Labour at standard, complete
$1,817
Hours booked
27.2 / 39.5
Sold for
$19,875

HARMONiQ costing and stock valuation come from HARMONiQ.

Activity and correspondence

Component requirements

StockNetting
4 lines still to issue against this machine
Component For Required On hand Allocated ahead Available On order ETA Shortfall
DC-MANUAL-MX
Maxam operator manual and parts book
Decal and document set, MX 1 15 1 14 0 — —
DC-MX-TOPPER
Maxam Topper decal set
Decal and document set, MX 1 15 1 14 0 — —
DC-PLATE-SER
Serial and compliance plate, engraved
Decal and document set, MX 1 150 6 144 1 — —
DC-SAFETY-SET
Safety decal set, AS/NZS
Decal and document set, MX 1 150 6 144 1 — —