BO-26-4112

FencePro Ultra G2S / Sidemount SM900 for Te Kuiti Fencing Supplies Ltd
NB Nathan General Manager
FencePro Ultra G2S / SM900 On track
Sales orderSO-26-1203 line 1
Serialassigned at QC sign-off
MastUltra G2S
BaseSidemount SM900
AttachmentsNone
Released7 Aug 2026
Final assembly4 Sep 2026
Promised to dealer11 Sep 2026
Convergence date
3 Sep 2026

Every sub-assembly is ready on or before 4 Sep 2026, the day final assembly is scheduled to start. This machine can be built on its date.

Critical path
Ultra G2S mast weldment
Complete 3 Sep
Onto the assembly bench 8 Sep 2026
Calculated completion 16 Sep 2026
Promised to dealer 11 Sep 2026

Production stages

Currently at stage 8 of 10 since 8 Sep 2026
  1. Released to production
    7 Aug
  2. Steel cut and prep
    10 Aug
  3. Fabrication and weld
    11 Aug
  4. Machining
    20 Aug
  5. Blast and paint
    24 Aug
  6. Hydraulic assembly
    28 Aug
  7. Final assembly
    4 Sep
  8. Test rig
    8 Sep
  9. QC sign-off
    9 Sep
  10. Ready for despatch
    10 Sep

Sub-assemblies

Platform
7 of 7 complete and in stores
Sub-assembly State Where Hours Required by Ready Verdict
Ultra G2S mast weldment
Mast weldment · 8 day build · SA-MW-ULTRAG2S
In stores Stores 21 / 21 3 Sep 3 Sep Complete 3 Sep
Sidemount SM900 base weldment
Base weldment · 4 day build · SA-BW-SM900
In stores Stores 11.5 / 11.5 3 Sep 3 Sep Complete 3 Sep
Hydraulic pack, standard
Hydraulic pack · 2 day build · SA-HP-STD
In stores Stores 2.5 / 2.5 3 Sep 3 Sep Complete 3 Sep
Valve bank assembly, Walvoil SD5 4-bank
Valve bank · 1 day build · SA-VB-SD5-4
In stores Stores 1.2 / 1.2 3 Sep 3 Sep Complete 3 Sep
Ram set, large mast
Ram set · 1 day build · SA-RS-L
In stores Stores 1.5 / 1.5 3 Sep 2 Sep Complete 2 Sep
Hose kit, large mast
Hose kit · 1 day build · SA-HK-L
In stores Stores 2 / 2 3 Sep 31 Aug Complete 31 Aug
Decal and document set, FP
Decal set · 1 day build · SA-DS-FP
In stores Stores 0.5 / 0.5 3 Sep 3 Sep Complete 3 Sep

Value in this job

Standard cost
Material issued to date
$11,305
Labour booked to date
$2,700
Work in progress
$14,005
Material at standard, complete
$11,305
Labour at standard, complete
$2,861
Hours booked
58.7 / 62.2
Sold for
$26,320

HARMONiQ costing and stock valuation come from HARMONiQ.

Activity and correspondence

Component requirements

StockNetting
0 lines still to issue against this machine
Component For Required On hand Allocated ahead Available On order ETA Shortfall